A heat pump outdoor unit beside the wall of a modern home

Heat Pumps

Heat pumps designed from a room-by-room heat loss calculation

Designed by an engineer, not a salesperson. Your heat pump is sized for your building, and you know which grants apply before you commit.

House grant
up to €14,500
Apartment grant
up to €11,500
Boiler scrappage
€2,000

Enquiry

Ask us about a heat pump

Your Eircode, your current heating and a rough year of build are enough to start.

Why the design decides how well a heat pump works

SMC Energy designs and installs heat pumps for homes and businesses in Ireland. Most of our work is retrofit: a heat pump in place of an existing boiler, in a building that is already lived or worked in.

A heat pump is most efficient when it heats water to a low temperature. How low it can go depends on how much heat each room loses and how large each radiator or underfloor loop is. That is why we size every system from a room-by-room heat loss calculation, not from a rule of thumb.

A heat pump sized this way can run at a lower flow temperature, so it costs less to run than one sized by rule of thumb. It also avoids the two common faults of a guessed design: rooms that never get warm, and a unit that is larger and dearer than the building needs.

Fig. 1Heat pump systemIllustrative
Illustrative heat pump heating system An outdoor heat pump unit sends heated water into the building through a flow pipe and takes it back through a return pipe. A valve sends the flow either to the hot water cylinder or to the heating circuit, which serves radiators and an underfloor heating loop. OUTSIDEINSIDE THE BUILDING Outdoor unit Hot watercylinder Radiators Underfloor heating loop FlowReturn Valve
Flow Return

What our way of working means for you

Heat pump grants for homes

SEAI pays the grant in three parts under its Better Energy Homes scheme. Together they come to €14,500 for a house and €11,500 for an apartment.

SEAI sets the grants and can change them. See the current rules on seai.ie.

SEAI Better Energy Homes: heat pump system grant
PartHouseApartment
Heat pump systemup to €10,500up to €8,500
Central heating upgrade, where the design needs itup to €2,000up to €1,000
Boiler scrappage€2,000€2,000
Maximum€14,500€11,500
Fig. 2Home grant, maximum by part
Heat pump systemCentral heating upgradeBoiler scrappage
  • Boiler scrappage is new from October 2026. SEAI now lists it where the heat pump replaces an oil or gas boiler, electric storage heating or a solid fuel system, and for homes with no central heating.
  • Who qualifies: the home has an MPRN (it is on your electricity bill) and was built and occupied before 2021.
  • Homes built before 2007 need a Technical Assessment, unless a valid BER shows a Heat Loss Indicator of 2.3 W/(K.m²) or lower. SEAI gives €200 towards the assessment.
  • The grant cannot be more than the cost of the works. Grant approval must be in place before any work starts.
  • Air-to-air heat pumps have a different, lower grant rate.

Eligibility depends on your home and on the design. We confirm it at survey, before you commit to anything.

Grants for businesses are different. See heat pumps for businesses below.

Is your building suitable for a heat pump?

Most buildings can take a heat pump. These four points decide what it takes in yours.

  • Heat loss

    How much heat a building loses decides the size of the heat pump and the flow temperature it needs. We calculate it room by room, so the answer is specific to your building and not a guess.

  • Insulation first

    A heat pump works best in a building that keeps its heat. Where the attic, walls or draughts lose a lot of heat, we tell you before you buy, because fixing them first can make the heat pump smaller and cheaper to run.

  • Technical Assessment for older homes

    For a home built before 2007, SEAI asks for a Technical Assessment, unless a valid BER shows a Heat Loss Indicator of 2.3 W/(K.m²) or lower. The assessment tells you whether the home is ready for a heat pump.

  • Radiators and pipework

    A heat pump heats water to a lower temperature than a boiler, so each radiator must be large enough for its room. Our design checks every one, and we replace only those that are too small.

From survey to monitoring

One engineering team from the first visit to monitoring after handover.

  1. 01

    Survey

    We visit the building, measure the rooms and look at the existing heating, pipework and electrical supply.

  2. 02

    Heat loss design

    We calculate the heat loss room by room and design the heat pump, emitters, cylinder and controls from it.

  3. 03

    Grant application

    We give you the design information the grant application needs. Grant approval must be in place before any work starts.

  4. 04

    Installation

    We install the heat pump, the hot water cylinder, any pipework and emitter changes, and the electrical work.

  5. 05

    Commissioning

    We fill, balance and test the system, set the controls, and show you how to use them.

  6. 06

    BER

    A post-works BER records the upgrade. The grant needs it before payment.

  7. 07

    Monitoring

    We monitor how the system performs after handover and adjust the settings where the data shows it can run better.

Heat pump with solar PV and a battery

A heat pump runs on electricity. Solar PV can supply part of it during the day, and a battery can store solar power for the evening. When we design them together, the electrical supply, the controls and the grant applications fit from the start.

  1. Residential Solar PV

    Solar PV and battery storage for your home, designed to work with your heat pump.

    A modern home with solar panels on the roof
  2. Commercial Solar PV

    Solar PV and battery storage for business sites, sized against your daytime load.

    A large commercial building with rooftop solar panels

Heat pumps for businesses

Chartered Engineer-led design and installation for commercial buildings.

Business heat pump projects are funded as a share of eligible costs, not as a fixed amount. Two SEAI schemes apply.

up to 45%

Business Energy Upgrades Scheme

Up to 45% of eligible costs for heat pumps, for applications from 6 October 2026.

up to 40%

Support Scheme for Renewable Heat

An installation grant of up to 40% for commercial, industrial, agricultural and public sector heat users outside the EU Emissions Trading System.

On larger projects we can act as your Owner's Engineer, checking the design and the contractor's work on your behalf. Where the heat pump must work with solar, batteries or other plant, our energy management systems coordinate them.

Heat Pumps - Frequently Asked Questions

How much is the SEAI heat pump grant?

The grant is paid under SEAI's Better Energy Homes scheme. For a house, up to €14,500: up to €10,500 for the heat pump system, up to €2,000 for central heating upgrades where the design needs them, and €2,000 boiler scrappage. For an apartment, up to €11,500. The grant cannot be more than the cost of the works.

Who qualifies for the heat pump grant?

The home must have an MPRN, which is on your electricity bill, and must have been built and occupied before 2021. Homes built before 2007 also need a Technical Assessment, unless a valid BER shows a Heat Loss Indicator of 2.3 W/(K.m²) or lower. We confirm eligibility at survey.

What is the boiler scrappage grant?

It is a €2,000 grant that is new from October 2026. SEAI now lists it where the heat pump replaces an oil or gas boiler, electric storage heating or a solid fuel system, and for homes with no central heating.

Do I need a Technical Assessment?

Only if your home was built before 2007 and you do not have a valid BER with a Heat Loss Indicator of 2.3 W/(K.m²) or lower. The assessment measures how much heat the home loses. SEAI gives €200 towards it, and it must be done before you apply.

Do I need new radiators?

Not always. Our heat loss calculation tells us the output each room needs at the heat pump's flow temperature. We keep the radiators and pipework that can deliver it, and replace only the ones that cannot. Where the design needs upgrades, the central heating grant can help to pay for them.

Will a heat pump work in an older house?

It can, if the design is based on how much heat the house really loses. In some older homes, insulation and draught sealing must come first, so the heat pump does not have to be oversized. The survey and the heat loss calculation show which applies to your house.

Are heat pumps noisy?

The outdoor unit has a fan and a compressor, so it makes some sound when it runs. We choose its position at survey, away from bedroom windows and neighbours where we can, and mount it so that vibration does not travel into the building.

Can a heat pump work with solar PV and a battery?

Yes. A heat pump runs on electricity, so solar PV can supply part of it, and a battery can store daytime solar for use in the evening. We design the three together so that the electrical supply, the controls and the grants fit.

Do you install heat pumps for businesses?

Yes. For businesses, the Business Energy Upgrades Scheme pays up to 45% of eligible costs for heat pumps from 6 October 2026. Larger heat users can look at the Support Scheme for Renewable Heat, which has an installation grant of up to 40%.

Who does the electrical work?

We do. SMC Energy does the electrical work on its own heat pump installations, so one team is responsible for the heat pump, its supply and its controls.

Find out what a heat pump needs in your building

Tell us about the building and its heating today. An engineer will design the system and confirm which grants apply.

Heat pump enquiry